Lease-End Facility Restoration - Elmhurst, IL

Industrial - Printing


This project involved restoring an industrial facility in preparation for lease expiration and scheduled property turnover. The lease required the removal of tenant-specific building modifications and restoration of affected areas to an acceptable condition. Our scope included selective demolition of existing equipment structures and interior installations, concrete equipment pit and trench infills, exterior and interior masonry restoration, brick staining, and parking lot concrete replacement. As the turnover date approached, additional restoration requests were incorporated into the project. We coordinated the evolving scope and completed the required work in time for the scheduled property turnover.

Scope Overview:

  • Selective Demolition: Removed existing industrial equipment structures and associated building modifications, including ink storage structures, an RTO structure and equipment, interior maintenance mezzanine, office, jib crane, fencing, structural steel components, curbing, rails, and bollards. Work also included preparation of affected surfaces for restoration.

  • Concrete Equipment Pit & Trench Infills: Performed saw cutting, demolition, and concrete infills to eliminate existing equipment pits and trenches throughout the facility. Work included infilling four T-shaped equipment pits, two scale pits, one wrapper pit, and approximately 30 linear feet of trench. Concrete infills had a hard-troweled finish to restore the affected floor areas.

  • Masonry Restoration: Completed exterior brick and interior concrete masonry repairs at locations affected by equipment removal and previous building modifications, including infilling wall openings, patching former pipe penetrations, matching existing brick and mortar, and cleaning repaired masonry surfaces.

  • Exterior Brick Staining: Applied custom color treatment to approximately 1,000 square feet of exterior brick and mortar that helped blend repaired masonry and former equipment locations with the surrounding building exterior.

  • Parking Lot Concrete Restoration: Restored an exterior concrete pavement area following the removal of an underground storage tank. Work included preparing the existing granular base, installing reinforcing dowels and expansion joints, placing 4,000 PSI air-entrained concrete, and restoring the pavement with a broom finish.